2026-02-11
Date | : | From 26 February 2026 (Thursday), 9 a.m. to 8 March 2026 (Sunday), 6 p.m. | |
Affected Area | : | Male toilets on Level 1 of DLB | |
Reason | : | Install isolation valves of chilled water pipe | |
Enquiry | : | Security Hotline (ext. 7777), Miss Yannie Lam (ext. 7982) or Ms. Rainbow Tang (ext. 2168) | |
Remarks | : | 1. | Construction noise, vibration and dust will be induced by the site works occasionally. |
2. | Works area will be fenced off and part of the affected area will be closed temporarily. | ||
3. | Please keep away from the area with construction works. | ||
4. | Please pay attention to the notices posted on site. | ||
日期 | : | 由二零二六年二月二十六日〔星期四〕上午九時 | ||||
受影響範圍 | : | 思齊樓一樓男洗手間 | ||||
原因 | : | 安裝冷氣水喉隔離閥工程 | ||||
查詢 | : | 校園保安熱線〔內線 7777〕ヽ林巧茵小姐〔內線 7982〕或鄧芷青女士〔內線 2168〕 | ||||
備註 | : | 1. | 工程將會間歇產生噪音ヽ震盪及塵埃。 | |||
2. | 工程範圍將被圍封。部分受影響範圍將會被暫時封閉。 | |||||
3. | 請遠離工程範圍。 | |||||
4. | 請留意現場告示。 | |||||