Shaw Campus – Temporarily Closure of Toilets on Level 1 of David C. Lam Building (DLB)
逸夫校園 – 暫時封閉思齊樓一樓洗手間

2025-06-06
 

Date

:

7 June 2025 (Saturday)     

Time

:

9 a.m. – 6 p.m.     

Affected Area

:

Toilets on Level 1 of DLB
For details of the affected area, please click here.

Reason

:

Renovation works to Polyomics Laboratory at DLB110 

Enquiry

:

Security Hotline (ext. 7777), Ms. Rachel Wong (ext. 5603), Miss Yannie Lam (ext. 7982) or Ms. Rainbow Tang (ext. 2168) 

Remarks

:

1.

Construction noise, vibration and dust will be induced by the site works occasionally.  

  

2.

Works area will be fenced off and part of the affected area will be closed temporarily.  

  

3.

Please keep away from the area with construction works.

  

4.

Please pay attention to the notices posted on site.  

 

日期

:

由二零二五年六月七日〔星期六〕

 

時間

:

上午九時至下午六時

 

受影響範圍_____

:

思齊樓一樓洗手間 
請按此處查看受影響範圍。

  

原因

:

思齊樓一樓DLB110室裝修工程

  

查詢

:

校園保安熱線〔內線 7777〕ヽ黃彥彤女士〔內線 5603〕﹞ヽ林巧茵 小姐﹝內線 7982﹞或 鄧芷青女士〔內線 2168〕 

  

備註

:

1.

工程將會間歇產生噪音ヽ震盪及塵埃。 

  
  

2.

工程範圍將被圍封。部份受影響範圍將會被暫時封閉。

  

 

 

3.

請遠離工程範圍。  

  
  

4.

請留意現場告示。