Shaw Campus – Temporary Closure of Lift Lobby on Level 1 of David C. Lam Building (DLB)  
逸夫校園 – 臨時封閉思齊樓一樓升降機大堂  

2025-05-29
 

Date

:

1 June 2025 (Sunday)  

Time 

:

9 a.m. – 6 p.m.   

Affected Area

:

Lift lobby on Level 1 of DLB
For details of the affected area, please click here.

Reason

:

Renovation works to Polyomics Laboratory at DLB110 

Enquiry

:

Security Hotline (ext. 7777), Ms. Rachel Wong (ext. 5603) or Miss Yannie Lam (ext. 7982)

Remarks

:

1.

Construction noise, vibration and dust will be induced by the site works occasionally.  

  

2.

Works area will be fenced off and part of the affected area will be closed temporarily.  

  

3.

To access other levels of DLB, please take the escalator at WLB to Li Promenade and proceed to the lift lobby on Level 3 of DLB. 

  

4.

Please pay attention to the notices posted on site.  

 

日期

:

二零二五年六月一日〔星期日〕

 

時間

:

上午九時至下午六時

 

受影響範圍_____

:

思齊樓一樓升降機大堂
請按此處查看受影響範圍。

  

原因

:

思齊樓一樓DLB110室裝修工程

  

查詢

:

校園保安熱線〔內線 7777〕ヽ黃彥彤女士〔內線 5603〕或 林巧茵小姐〔內線 7982〕

  

備註

:

1.

工程將會間歇產生噪音ヽ震盪及塵埃。 

  
  

2.

工程範圍將被圍封。部份受影響範圍將會被暫時封閉。

  

 

 

3.

如需到達思齊樓其他樓層,請使用永隆銀行商學大樓之扶手電梯, 經由李作權大道前往思齊樓三樓升降機大堂。

  
  

4.

請留意現場告示。