Baptist University Road Campus – Erection of Scaffolding at 9/F and 10/F of Madam Chan Wu Wan Kwai School of Continuing Education Tower (SCE)
浸會大學道校園 – 陳瑞槐夫人胡尹桂女士持續教育大樓九樓及十樓搭建棚架工程 

2024-08-09

Date

:

From  13 August 2024 (Tuesday) to 31 August 2024 (Saturday)

Affected Area

:

The external walls of female toilets and male toilets at 9/F and 10/F of SCE
For details of the affected areas, please click here

Reason 

:

Renovation works to 9/F and 10/F of SCE. 

Enquiry 

:

Security Hotline (ext. 7777), Ms. Ada Yeung (ext. 2166) or Miss Alpha Chan (ext. 2238)

Remarks

:

1.

Area with construction works will be fenced off.

  

2.

Please keep away from the areas with construction works.

 

 

3.

Nuisances from construction will be induced intermittently.

  

4.

Please close the windows.

 

 

5.

Please pay attention to the notices posted on site.

 

日期

:

由二零二四年八月十三日〔星期二〕
至二零二四年八月三十一日〔星期六〕

受影響範圍_____

:

陳瑞槐夫人胡尹桂女士持續教育大樓九樓及十樓男洗手間及女洗手間外牆
請按此處查看受影響範圍。

原因

:

陳瑞槐夫人胡尹桂女士持續教育大樓九樓及十樓裝修工程

查詢

:

校園保安熱線〔內線 7777〕、楊沛怡女士〔內線 2166〕 或 陳淑君小姐〔內線 2238〕

備註

:

1.

工程範圍將會被圍封。

  

2.

請遠離工程範圍。

 

 

3.

工程將會帶來間歇性滋擾。

  

4.

請關閉窗戶。

 

 

5.

請留意現場告示。