2024-05-27
Date | : | From 25 May 2024 (Saturday) to 5 July 2024 (Friday) | |
Affected Area | : | Level 5 of Shaw Tower and Li Promenade | |
Enquiry | : | Security Hotline (ext. 7777), Ms. Rachel Wong (ext. 5603), Mr. Frank Lau (ext. 5626) or Mr. Ryan Chow (ext. 5698) | |
Remarks | : | 1. | Areas with construction works will be fenced off. |
2. | Please keep away from the areas with construction works. | ||
|
| 3. | Nuisances from construction will be induced intermittently. |
4. | Please pay attention to the notices posted on site. |
日期 | : | 由二零二四年五月二十五日〔星期六〕 | |
受影響範圍_____ | : | 逸夫行政樓五樓及李作權大道 | |
查詢 | : | 校園保安熱線〔內線 7777〕、黃彥彤女士〔內線 5603〕、劉永昌先生 ﹝內線 5626﹞或 鄒啟耀先生﹝內線 5698﹞ | |
備註 | : | 1. | 工程範圍將會被圍封。 |
2. | 請遠離工程範圍。 | ||
|
| 3. | 工程將會帶來間歇性滋擾。 |
4. | 請留意現場告示。 |