Baptist University Road Campus – Erection of Scaffolding for Pedestrian Walkway of Student Resident Halls (North Tower)
浸會大學道校園 – 學生宿舍〔北座〕行人通道棚架搭建工程

2024-05-21
 

Date

:

From 27 May 2024 (Monday) to 2 June 2024 (Sunday)

Affected Area

:

Student Residence Halls (North Tower)
For details of the affected area, please click here.

Enquiry

:

Security Hotline (ext. 7777), Ms. Kiki Hui (tel. 93500011, Contractor representative for enquiry on SRH façade enhancement project) or Miss Yannie Lam (ext. 7982)

Remarks

:

1.

Areas with construction works will be fenced off.

  

2.

Please keep away from the areas with construction works.

 

 

3.

Nuisances from construction will be induced intermittently.

  

4.

Please pay attention to the notices posted on site.

 

日期

:

由二零二四年五月二十七日〔星期六〕
至二零二四年六月二日〔星期日〕

受影響範圍_____

:

學生宿舍〔北座〕
請按此處查看受影響範圍。

查詢

:

校園保安熱線〔內線 7777〕、許康祺小姐〔電話93500011,承建商代表,負責學生宿舍外墻翻新工程問題咨詢〕 或 林巧茵小姐〔內線 7982〕

備註

:

1.

工程範圍會被圍封。

  

2.

請遠離工程範圍。

 

 

3.

工程將會帶來間歇性滋擾。

  

4.

請留意現場告示之安排。