Ho Sin Hang Campus – Replacement of Ceiling Panels and Scaffolding Works on Level 5 of Fong Shu Chuen Library
善衡校園 – 方樹泉圖書館更換天花及搭棚工程

2023-08-11

 

Date        

:

From 12 August 2023 (Saturday) to 30 August 2023 (Wednesday)

Affected Area

:

The corridor outside FSC501 and the staircase entrance of Level 5, Fong Shu Chuen Library

For details of the affected areas, please click here.

Enquiry

:

Security Hotline (ext. 7777) or Ms. Yoyo Yiu (ext. 2498)

Remarks

:

1.   Scaffoldings will be erected in the construction area.  The affected area will be partially fenced off.

2.  Please keep away from the areas with construction works.

3.  Nuisances from construction will be induced intermittently.

4.  Please pay attention to the notices posted on site.

 

 

日期

:

由二零二三年八月十二日﹝星期六﹞

至二零二三年八月三十日﹝星期三﹞

受影響範圍

:

方樹泉圖書館501室外走廊及五樓樓梯出口                      

請按此處查看受影響範圍。

查詢

:

校園保安熱線﹝內線 7777﹞或 姚佩珊小姐﹝內線 2498﹞

備註

:

1.   工程範圍將有棚架豎起,受影響範圍會局部被圍封。

2.  請遠離工程範圍。

3.  工程將會帶來間歇性滋擾。

4.  請留意現場告示。